top of page
stay + golf.png

Private Villa Project – Basement Installation ( Hanoi )

  • Completion Date: July 2025 (07/2025)

  • Total Construction Period: 2 Weeks

  • Total GTR Simulators: 1 Set

  • Equipment Model: GTRS-2000

  • Additional Features: Equipped with Auxiliary Camera & Monitor

  • Location: Hanoi Region

Private Villa Project –
Basement Installation ( Hanoi )

[ Project Overview ]

This project features the installation of a GTR simulator system in the basement (underground parking area)

of a luxury private villa in Hanoi. To optimize the user experience, add more enjoyment,

and boost practice effectiveness, the system was upgraded with an auxiliary camera and an auxiliary monitor.

These enhanced features allow players to intuitively monitor and analyze their technique from multiple angles

while reviewing immediate swing feedback. Ultimately, this setup transforms a private family area into a highly vivid,

modern, and premium entertainment space.

  • Completion Date: July 2025 (07/2025)

  • Total Construction Period: 2 Weeks

  • Total GTR Simulators: 1 Set

  • Equipment Model: GTRS-2000

  • Additional Features: Equipped with Auxiliary
    Camera & Monitor

  • Location: Hanoi Region

[ Project Overview ]

This project features the installation of a GTR

simulator system in the basement

( underground parking area)

of a luxury private villa in Hanoi.

To optimize the user experience, add more enjoyment,

and boost practice effectiveness, the system was

upgraded with an auxiliary camera and an auxiliary monitor. These enhanced features allow players to

intuitively monitor and analyze their technique from multiple angles while reviewing immediate swing

feedback. Ultimately, this setup transforms a private

family area into a highly vivid, modern, and premium

entertainment space.

bottom of page